How long does a built-in wardrobe take?

The stages of a custom wardrobe job, how long each one typically takes, what can slow it down and how to keep it moving.

Short answer: a custom built-in wardrobe is a two-visit job: the onsite consult and measure, then the installation, with factory time between them. Installation of a standard bedroom robe is usually a day. The gap between consult and install depends on the factory schedule and what you choose; the designer gives you the expected timeframe at the consult, and that is the number to rely on.

Here is what happens at each stage and what affects how long it takes.

Stage 1: Consult and measure

One visit, usually under an hour. The designer comes to your home, measures the opening (floor to ceiling, wall to wall, depth, skirting, cornice, bulkheads), talks through what you own and how you dress, and brings colour samples. You get a layout and a quote for that wardrobe.

Keeps it moving: having a rough idea of what you want, choosing the colour at the consult, and deciding sliding or hinged with the designer’s advice rather than afterwards.

Stage 2: Quote and go-ahead

Your timeframe. The quote spells out the door type, internals, colour, removal of the old wardrobe and any extras. Once you accept, the job goes into the factory schedule.

Keeps it moving: asking questions at the consult rather than by email later, and confirming promptly.

Stage 3: Factory

The gap between the two visits. The wardrobe is cut, edged and assembled to your measurements in our Blacktown factory. Standard polytec colours and mirror doors are in stock; special-order glass or an unusual colour may add to this stage.

Keeps it moving: choosing from the standard range where you can.

Stage 4: Preparation at your end

Before install day. Empty the old wardrobe completely. Clear a path from the front door to the room. If lighting is going in, the electrician is booked for after the cabinetry.

Stage 5: Install

Usually a day for a bedroom robe. The old wardrobe comes out and goes on the truck. The new carcass is levelled and fixed, internals fitted, doors hung and adjusted, and the room is left clean. A walk-in re-fit is similar. Several wardrobes in one house are scheduled over consecutive days.

Stage 6: After

Lighting, if any, is connected by the electrician. You fill the wardrobe. If anything needs adjusting, the installer who fitted it is the person who comes back.

What changes the timeline

Factor Effect
Standard colour and mirror doors Quickest
Special-order glass or colour Adds factory time
Removal of an old wardrobe Usually within the install day
Making good walls after removal May need a painter before install
Lighting Electrician after cabinetry
Access (stairs, lifts, strata rules) Planned at the consult so it does not add time
A whole house of wardrobes Several install days

Timing a job around a move

If you have a settlement, a tenant or a baby due, say so at the consult. The designer plans the job to the date where the factory schedule allows. A standard specification gives the most room to move.

Why a measured quote and not a website estimate

We do not publish timeframes, because the honest answer depends on the factory schedule the week you book and on what you choose. The designer gives you a real timeframe at the consult, and that is the one we work to.

Good to know

Questions people ask about this

Anything else? Ask your designer at your onsite consult.

How long is the installation itself?

For a standard bedroom sliding robe, usually a day, including removal of the old wardrobe. A walk-in re-fit is often a day. A full house of wardrobes is scheduled over several days.

What slows a job down?

Undecided colours, access problems on install day, and waiting on another trade (an electrician for lighting, a painter for a wall). Choosing the colour at the consult and clearing the room before install day keeps things on time.

Can it be done faster for a house settlement or a tenant moving in?

Tell the designer the date at the consult. Where the factory schedule allows, jobs with a hard deadline are planned to it. Standard specifications are quicker than special-order glass or colours.